LVDUN 96x80 in ultra slim frame aluminium interior sliding doors installation guide

Aug 19 , 2021

LVDUN 96x80 in ultra slim frame aluminium interior sliding doors installation guide

0 Comments


Sill. Head Jamb and side jambs. Installation flange over there and the fixed panel here. The tools required for installation include a power drill, a long Torx screwdriver, and a set of Hex wrenches.The first step is to assemble the head and the side jambs. First, lay the head and the side jambs on the floor. These are accessories required to assemble the head and side jambs. First, put the plastic plugging hole on the upper part of the side jamb, then align it, use screws to connect the head to the side jamb through the rubber plug, and repeat for the other side. The cross-section installed outside the head and the side jamb is an f-shaped slot, and it should be flush. Now put the assembled head and side jambs aside for a little while, and then we need to assemble the installation flange. Now we put the installation flange on the floor and start to assemble it. Next, these are the accessories needed to assemble the installation flange. For now, we insert the bracket components and the corner piece into the flange. After the assembly is completed, use a hexagonal wrench to tighten the bracket and align the 45-degree seams.After tightening the bracket, screw the jackscrew into the corner piece. Just do it properly and do not over-tighten and repeat for the other side. One screw on each side is sufficient. Next, we buckle the assembled flange onto the assembled rail and the side jambs. Next, put the assembled flange, rail, and side jambs into the hole together. Now fix the rail and the side jambs with screws, and now we need to find the verticality of the side jamb with a laser level. Next, put the lower rail into the ground of the hole and start to install the door panel. In the process of installing the panel, three places need to be adjusted: the upper pulley, the lower pulley, and the buffer. Before the panel is installed into the rail, the expansion distance of the upper pulley needs to be adjusted to the minimum.Before the panel is installed into the rail, the expansion distance of the upper pulley needs to be adjusted to the minimum. Rotate the screw counterclockwise to reduce the expansion distance and rotate it clockwise to increase the expansion distance. We first turn it counterclockwise and adjust it to the lowest. Next, we put the panel into the rail. When we first do it, the gap between the panel and the upper rail is relatively large. Then we need to adjust the upper pulley to expand it. Next, you need to use a long screwdriver to insert from the top of the panel, and then find the adjusting screw of the upper pulley, and turn it clockwise until there is no shaking gap between the panel and the rail. Do not over-tighten in case you feel too tight or heavy when pulling the panel. Next, we adjust the lower pulley as the height of the panel is determined by the lower pulley. First, we insert the hexagonal wrench into the adjusting screw of the lower pulley, turn it clockwise to raise the panel, and turn it counterclockwise to fall, and then adjust it to a suitable horizontal position. Next, we need to adjust the damper locator. Where is it? On the upper rail. Let's take a look, the black accessory is the damper locator. We need to use a small hexagonal wrench to turn the two small black screws counterclockwise and then loosen it. After that, the locator can slide left and right. We generally adjust a position first. Then fix it, and turn the small screw clockwise to tighten it. Now, let's test whether the position of the locator just now is accurate. We pull the panel, and now we can see that the panel is about ten centimeters away from the frame, which shows that the position of our locator is not adjusted correctly. Now we adjust again according to the distance. After adjusting the position of the locator again, we will test whether its position is accurate. Now we can see that the panel has completely entered the side frame, and the buffer distance is appropriate. Now we can be sure that the position of this locator is accurate. Now that the adjustment of the entire door panel is over, let's do the final finishing work. Now we buckle the decorative buckle to the side jamb and repeat for the other side. The screw hole of the upper rail is blocked with a decorative hole plug. Until now, the installation of the entire sliding door is over. Now let's take a look at its sliding effect. The sliding door that has been installed is a sliding door with a double-wrapped opening. Next, let's take a look at this double-wrapped sliding door and several points we need to pay attention to. Company Website:https://www.lvdunwindows.com About Us:https://www.youtube.com/watch?v=AjK3I9VoNJ8 Youtube:https://www.youtube.com/channel/UCFxIXe0EE368wC-M5PSBfig

Leave a comment

Please note, comments must be approved before they are published